A social housing complex, built in 1940, has been refurbished whilst people were still living in the building.
Single stove ovens were exchanged against electric panels, gas heating was maintained where existing from before.
A PV-plant on the roof enables some amount of self-supply.
Decentralized ventilation systems were implemented in 1/3rdof the flats. In addition, several additional improvements to the building have been incorporated in the refurbishment process, such as new balconies and elevators.
Ownership
Innsbrucker Immobilien IIG
Gross volume: 7.653 m³
Gross surface: 2115 m²
Number of dwellings: 34
Energy performance
BEFORE
246.3 kWh/m*a
TARGET/AFTER
39.4 kWh/m*a
Main lessons learnt
The comprehensive refurbishment of a building is a combination of energy solutions and improvements for user comfort.
Investments have to balance these two aspects in an optimal way. As such, challenges are financial, technical and social ones.
In respect to tenants, the burden of noise, dust and intrusion into personal space, as well as disturbance of daily routines, is enormous.
Permanent dialog and crisis management demand special abilities of a building manager.
Finding optimal and cheap solutions with least interference into the building structure are important in terms of ventilation and heating systems. It requires repeated revision in the planning process.
Here, a centralized heating system was given up in favor of exchanging single ovens with single electricity heating devices, fed by house owned PV. Also only 1/3 of the apartments have been equipped with ventilation systems – only those, which were empty and those where the arrangement of tubes could be implemented without major interference in the building structure (all the flats on the top floor, where tubes are now led through the attic)
After refurbishment, it takes a long while until frustration of the tenants about the building process is substituted by happiness about their newly insulated building and reduced heating demand.
Proper usage of a passive house demands intensive communication with the tenants who are advised to change their life style in order to reach optimal energy savings (no long-term tilting of windows, or T-shirts in winter with heating above 25 ͦC).
Also optimal usage (self-supply) of the PV-electricity during day time takes time for adapting usage habits of electrical devices.
Detailed implantation of the building(s)
Building envelope
Technical system
Decentralized heating system with gas, electricity, oil, wood – several single ovens
Thermal imaging before refurbishment
Energy performance certificate
Category E
Concept
A full refurbishment was planned of the building envelope, the heating system and air ventilation As accompanying measures, disability access through elevators and new balconies (thermally decoupled) should be implemented.
Energy solutions
Performances targets
Reduction of total energy consumption by more than 60%.
Envelope details
Roof to wall insertion section (thermal bridge)
Triple-glazing windows with building integrated PV 5Wh shading element.
Insulation of the attic floor by using 40 cm cellulosic
Ground to wall section (thermal bridge)
Additional wood whool thermal insulation of the lowest storey ceiling (17.5cm).
Wall to fenestration section (thermal bridge)
Thermal insulation of façade (22cm EPS) and Thermal insulation of inner yard (12cm PU). Perimeter Insulation between 6 -14 cm
Technical system
Mechanical ventilation
Centralized ventilation systems to be installed. However only 1/3 of the apartments are to be equipped with ventilation systems : only those which were empty and those where the arrangement of tubes could be implemented without major interference in the building structure (all the flats on the top floor, where tubes are now led through the attic)
Electric renewable integration
Installation of a PV system on the roof. Characteristics are as bellow:
Nominal power:17,34 kWp
PV array area: 113,1 m² Module type: Solarwatt
Inverter Type: AE Conversion
Mounting type: Roof mounted parallel Elevation: 574 m a.s.l.
Tilt: 38°
Azimuth angle: 225 °/135°
Model: Power reduction for consumers
Stakeholders involved
Contracting authority
IIG - Innsbrucker Immobilien GmbH & Co KG
Project manager
DI Walter Aistleitner
Architect
din-a4 Architekten
Envelope designer
Technical system designer
HSL planning – Alpsolar Klimadesign electric planning – Zösmayr Elektrotechnik
Windows supplier
Internorm
Costs and financing
Refurbishment costs
Not applicable
Financial resources
Most of the works are financed by IIG, using rental reserves accumulated from previous years. The monthly rent is on average 3.56 €/ m² / month and are not to be increased for this project. The operational costs are (without heating and electricity) about 1.58€/m²*month.
In addition to IIG’s investment, the refurbishment is co-financed by the European Union.
Payback period: 10 years (using an interest rate of 3 months Euribor + 0,43 %)
Implementation planning
1 - Signature consortium agreement: 2014
2 - Start of refurbishments: 05-2015
3 - Completed refurbishments: 11-2016
Work progress
Important points of refurbishment process and short description
Architectonic concept
Detail of balcony/elevator solution
Thermal image after insulation
Envelope characteristics
Facade insulation 22cm Expanded Polystyrene (EPS), U-value 0.15; roof cellulose 40cm, U-value 0.1 -0.12; ceiling basement U-value 0.26; glazing Ug 0.5 and Uw 0.66; shading built into the window; flanking insulation 12 cm for reduction of thermal bridges; balconies thermally uncoupled.
The construction of the balconies is performed in cross laminated timber (CLT) for floor and ceiling, and steel columns. The existing roof has been checked statically for photovoltaics and for solar thermal energy.
Technical system
Electric installation works and installation of ventilation systems have been properly done. Elevators have been fully completed.
Six empty dwellings have been retrofitted completely and have been re-settled after refurbishments. Additionally some tenants have agreed on monitoring of the energy use, and of the electricity consumption, as well as of the air quality.
Renewable energy sources
The PV installation has a capacity of around 17,34 kWp. This electricity can be used for personal consumption (off-grid system) or can be fed into the public electricity network (grid-connected system).
There are power inverters with 0,5 kW for each flat, linked to two PV modules each.
So far, for a test-period between June and November 2017, own domestic consumption rate resulted in around 56%. Excess electricity is fed into the grid.
This domestic consumption could be improved, if electric devices (especially hot water boilers, washing machines etc.) would be fed domestically mainly during day time (sun-shine hours).
Energy performance after refurbishment
Calculated energy consumption per m² of total used conditioned floor area of about 40 kWh/m²*a. was reached, and electricity savings of 30% are foreseen.
Building owner
Innsbrucker Immobilien IIG
Architecture / Engineering
din-a4 Architekten
Contact
Standortagentur Tirol